The following links take you to conceptual architect's drawings for Central and for East for which borrowing would have been authorized had the April 3, 2007 referendum passed.

I. One set of floor plans is color-coded to show you:

a) Which areas of the finished building would have been new construction;

b) Which areas would have undergone "heavy renovation" (total replacement of all mechanical systems, moving of walls, restoration of the rooms and corridors to modern standards;

c) Which areas would have undergone "light renovation" (same standards as heavy remodeling but no moving of interior walls; etc.

II. A second set of floor plans is color-coded to show you:

a) The intended use for the spaces in what would have been the renovated, expanded schools;

b) You can study where the following facilities would have been had the referendum question(s) passed: Learning space for Math, Science, English, History, Music, Drama, Art, Physical Education and Athletics, Applied Technology and other subjects together with staircases, entrances, elevators, restrooms, the main office, guidance areas, the cafeteria, the library, etc.

Four Station Gymnasium w/ Track
Architects Conceptual Sketch of Layout 

Brookfield Central
Conceptual Exterior Views (Four renderings)
Conceptual Floor Plan - by Type of Construction
Conceptual Floor Plan - by Use of Space
Conceptual Site Plan   - Showing parking, building foot print etc.

Brookfield East
Conceptual Exterior Views (Four renderings)
Conceptual Floor Plan - by Type of Construction
Conceptual Floor Plan - by Use of Space
Conceptual Site Plan   - Showing parking, building foot print etc.

Please note that under the EAST material, only one type of floor plan is shown (the two floorplan buttons do not work separately), and no site plan is shown.